Making bajri path including preparation of subgrade, supplying and laying brick aggregate of 50 mm nominal size 7.5 cm deep with blinding material consisting of 12 mm moorum and 12 mm red bajri consolidated with road roller

Item number
16.10
Analysis basis
Details of cost for 100sqm.
Priced inputs
12
Derived rate
₹191.25
D-01/RATE ANALYSISITEM 16.10

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.10 (Making bajri path including preparation of subgrade, supplying and laying brick aggregate of 50 mm nominal size 7.5 cm deep with blinding material consisting of 12 mm moorum and 12 mm red bajri consolidated with road roller) is derived from 12 priced inputs and works out to ₹191.25 after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Earth work in excavation including dressing
  • etc.
  • 100x0.075=7.5cum.
  • Collection and stacking of brick aggregate
  • 53mm nominal size 100x0.075 =7.50cum.
  • Supply staking Red Bajri
  • 100x0.012= 1.2 cum
  • Supply staking Red Bajri
  • 100x0.012= 1.2 cum
  • Collection and stacking of moorum at site
  • 100x0.012 = 1.20cum.
  • Spreading and consolidation of brick
  • aggregate and blinding material etc.
  • Spreading of red bajri, watering and rolling
ANALYSIS OF RATES · ITEM 16.10DETAILS OF COST FOR 100SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
SUB(Rate as per item no.2.6.1 of S.H. Earth work)Rate as per item 2.6.1cum7.5177.501,331.25
0286MATBrick Aggregate (Single size) : 50 mm nominal sizecum7.5700.005,250.00
SUBRate as per Item Number 16.3.8 of SH: Road WorkRate as per item 16.3.8cum1.21,564.901,877.88
SUBRate as per Item Number 16.3.10 of SH: Road WorkRate as per item 16.3.10cum1.2768.25921.90
0114LABBeldarday1.95736.001,435.20
0115LABCoolieday2.63736.001,935.68
0101LABBhistiday1.35816.001,101.60
0003MACHHire charges of Diesel Road Roller - 8 to 10 tonneday0.1353,350.00452.25
0113LABChowkidarday0.135736.0099.36
9999MATSundriesL.S.20.152.2745.74
0003MACHHire charges of Diesel Road Roller - 8 to 10 tonneday0.0543,350.00180.90
0113LABChowkidarday0.054736.0039.74
BUILD-UP TO RATE
TOTAL
14,671.50
Add 1 % Water charges on “W-A”
+105.40
TOTAL
14,776.90
Add GST on “X-A” (multiplying factor 0.2127)
+2,264.38
TOTAL
17,041.28
Add 15% CPOH on “Y-A”
+1,936.54
TOTAL
18,977.82
Add Cess @ 1% on “Z-A”
+148.47
Cost for 100 sqm.
19,126.29
Cost per sqm.
191.26
SAY
₹191.25
D-02/SOURCEPRINTED PAGE 1154
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1154

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1154. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.