R/DAR 2023

Providing and fixing bright finished brass fan light pivot with necessary brass screws etc. complete

Item number
14.36
Analysis basis
10 nos
Priced inputs
4
Derived rate
₹47.30/ NOS
D-01/RATE ANALYSISITEM 14.36

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.36 (Providing and fixing bright finished brass fan light pivot with necessary brass screws etc. complete) is derived from 4 priced inputs for 10 nos and works out to ₹47.30 each after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 14.36DETAILS OF COST FOR 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0429MATBrass fanlight pivot10 Nos1184.00184.00
0450MATBrass screws 40 mm100 Nos0.4187.0074.80
9977MATCarriage of materialL.S.0.912.272.07
0111LABCarpenter 1st classday0.08897.0071.76
BUILD-UP TO RATE
TOTAL
332.63
Add 1 % Water charges on “W”
+3.33
TOTAL
335.96
Add GST on “X” (multiplying factor 0.2127)
+71.46
TOTAL
407.42
Add 15% CPOH on “Y”
+61.11
TOTAL
468.53
Add Cess @ 1% on “Z”
+4.69
Cost of 10 Nos
473.22
Cost of each
47.32
SAY
₹47.30
D-02/SOURCEPRINTED PAGE 1076
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1076

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1076. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.