CPWD Analysis of Rates · Repairs to Buildings
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge
With cement mortar 1:4 (1 cement : 4 fine sand)
- Item number
- 14.1.1
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 6
- Derived rate
- ₹547.40 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.1.1 — Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge With cement mortar 1:4 (1 cement : 4 fine sand) — is derived from 6 priced inputs for 10 sqm and works out to ₹547.40 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Cement mortar 1 : 4 (1 cement : 4 fine sand)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Item Number 3.4 of SH: MortarsRate as per item 3.4Sub-analysis | cum | 0.183 | 3,708.80 | 678.71 | |
| 0155 | Mason (average)Labour | day | 1.21 | 857.00 | 1,036.97 |
| 0115 | CoolieLabour | day | 1.29 | 736.00 | 949.44 |
| 0114 | BeldarLabour | day | 0.54 | 736.00 | 397.44 |
| 0101 | BhistiLabour | day | 0.92 | 816.00 | 750.72 |
| 9999 | Scaffolding and sundriesMaterial | L.S. | 15.21 | 2.27 | 34.53 |
- TOTAL
- 3,847.81
- Add 1 % Water charges on “W”
- 38.48
- TOTAL
- 3,886.29
- Add GST on “X” (multiplying factor 0.2127)
- 826.61
- TOTAL
- 4,712.90
- Add 15% CPOH on “Y”
- 706.94
- TOTAL
- 5,419.84
- Add Cess @ 1% on “Z”
- 54.20
- Cost of 10.00 sqm
- 5,474.04
- Cost of 1.00 sqm
- 547.40
- Say
- 547.40
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1039. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works