CPWD Analysis of Rates · Reinforced Cement Concrete
Reinforced cement concrete work in chimneys, shafts, up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
- Item number
- 5.6
- Analysis basis
- Details of cost for 1 cum.
- Priced inputs
- 2
- Derived rate
- ₹11,125.20 / cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 5.6 — Reinforced cement concrete work in chimneys, shafts, up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) — is derived from 2 priced inputs for 1 cum and works out to ₹11,125.20 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- RCC 1:1 :3 in chimneys & shafts
- Extra labour involved for laying cc in chimneys,shafts
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Item No.5.2.2 of SH: Reinforced Cement C½oncrete WorkRate as per item 5.2.2Sub-analysis | cum | 1 | 10,852.95 | 10,852.95 | |
| 0115 | CoolieLabour | day | 0.26 | 736.00 | 191.36 |
- TOTAL
- 11,044.31
- Add 1 % Water charges on “W-A”
- 1.91
- TOTAL
- 11,046.22
- Add GST on “X-A” (multiplying factor 0.2127)
- 41.11
- TOTAL
- 11,087.33
- Add 15% CPOH on “Y-A”
- 35.16
- TOTAL
- 11,122.49
- Add Cess @ 1% on “Z-A”
- 2.70
- Cost for 1 cum.
- 11,125.19
- Say
- 11,125.20
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 214. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works