CPWD Analysis of Rates · Reinforced Cement Concrete
Cement concrete pavement with 1:1.5:3 (1 (Ref Item sand derived from Recycled Concrete Aggregate(RCA) upto 20% : 3 graded stone aggregate 20 No.11.7) mm nominal size including Recycled Concrete Aggregate (RCA) upto 20%). including finishing complete
- Item number
- 5.12A/Sub-AR-2/Sub-AR-3
- Analysis basis
- Details of cost for one cum.
- Priced inputs
- 5
- Derived rate
- ₹8,886.70 / Cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 5.12A/Sub-AR-2/Sub-AR-3 — Cement concrete pavement with 1:1.5:3 (1 (Ref Item sand derived from Recycled Concrete Aggregate(RCA) upto 20% : 3 graded stone aggregate 20 No.11.7) mm nominal size including Recycled Concrete Aggregate (RCA) upto 20%). including finishing complete — is derived from 5 priced inputs for one cum and works out to ₹8,886.70 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- Cement concrete 1:1.5:3
- Extra labour for laying in floors etc.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Sub AR-1 (Ref item no.4.1.2)Rate as per item Sub AR-1Sub-analysis | cum | 1 | 8,170.05 | 8,170.05 | |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.35 | 816.00 | 285.60 |
| 0114 | BeldarLabour | day | 0.18 | 736.00 | 132.48 |
| 0101 | BhistiLabour | day | 0.05 | 816.00 | 40.80 |
| 9999 | SundriesMaterial | L.S. | 19.76 | 2.27 | 44.86 |
- TOTAL
- 8,673.79
- Add 1 % Water charges on “W-A”
- 5.04
- TOTAL
- 8,678.83
- Add GST on “X-A” (multiplying factor 0.2127)
- 108.22
- TOTAL
- 8,787.05
- Add 15% CPOH on “Y-A”
- 92.55
- TOTAL
- 8,879.60
- Add Cess @ 1% on “Z-A”
- 7.10
- Cost of 1 Cum.
- 8,886.70
- Say
- 8,886.70
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 243. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.