CPWD Analysis of Rates · Pile Work
Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge
- Item number
- 20.9
- Analysis basis
- Detail of cost for one pit test (Ten pits in
- Priced inputs
- 5
- Derived rate
- ₹1,153.20 / one pit
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 20.9 — Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge — is derived from 5 priced inputs for one pit and works out to ₹1,153.20 per one pit after water charges, GST, CPOH and cess. The full build-up is below.
- one day)
- Miscllaneous
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0081 | Pile Integrity testing equipmentMachinery | day | 0.1 | 3,350.00 | 335.00 |
| 0160 | TechnicianLabour | day | 0.1 | 973.00 | 97.30 |
| 0161 | Helper (Technician)Labour | day | 0.1 | 736.00 | 73.60 |
| 9999 | Reporting chargesMaterial | L.S. | 100.67 | 2.27 | 228.52 |
| 9977 | Transportation and consumables etc.Material | L.S. | 33.56 | 2.27 | 76.18 |
- TOTAL
- 810.60
- Add 1 % Water charges on “W”
- 8.11
- TOTAL
- 818.71
- Add GST on “X” (multiplying factor 0.2127)
- 174.14
- TOTAL
- 992.85
- Add 15% CPOH on “Y”
- 148.93
- TOTAL
- 1,141.78
- Add Cess @ 1% on “Z”
- 11.42
- Cost per test
- 1,153.20
- Say
- 1,153.20
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1811. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works