CPWD Analysis of Rates · New Technologies and Materials
Filling and finishing the holes of varies sizes shuttering while de-shuttering ) with GP-2 cementitious polymer compound mixed with water in ratio prescribed by manufacturer to form consistent workable enough for pasting over cement concrete cones and pushing it in the holes upto full depth of wall using appropriate tools and finishing smooth all complete as per directions of the Engineer-in-charge
- Item number
- 26.94/Sub-AR-1
- Analysis basis
- Details of cost for 110 holes
- Priced inputs
- 4
- Derived rate
- ₹9.00 / holes
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.94/Sub-AR-1 — Filling and finishing the holes of varies sizes shuttering while de-shuttering ) with GP-2 cementitious polymer compound mixed with water in ratio prescribed by manufacturer to form consistent workable enough for pasting over cement concrete cones and pushing it in the holes upto full depth of wall using appropriate tools and finishing smooth all complete as per directions of the Engineer-in-charge — is derived from 4 priced inputs for 110 holes and works out to ₹9.00 per holes after water charges, GST, CPOH and cess. The full build-up is below.
- GP 2 Compound applied over the cement
- concrete cones 8 kg including wastage
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 5774 | GP 2 cementitious compoundGP-2 cementitious compoundMaterial | kg | 8 | 22.00 | 176.00 |
| 0124 | Mason 2nd classMason 2nd classLabour | each | 0.45 | 816.00 | 367.20 |
| 0114 | BeldarLabour | each | 0.45 | 736.00 | 331.20 |
| 9999 | Sundries for T&P and scaffolding etc.Material | L.S. | 50 | 2.27 | 113.50 |
- Total cost of 110 holes
- 987.90
- Cost per holes
- 8.98
- Say
- 9.00
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 2051. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works