CPWD Analysis of Rates · New Technologies and Materials

Providing and fixing at all height false ceiling of 4 mm thick phenol bonded Bamboo Mat board (595x595 mm) conforming to IS:13958-1994 including providing and fixing of frame work made of GI angle 25x25x0.4 mm thick all around suitably fixed to wall with the help of dash fastener and hanger frame (600x600 mm c/c) made GI slotted Tee having powder coating on bottom side (30x25x0.3 mm thick for main member & 25x25x0.3 mm for cross member) connected to ceiling with 2.64 mm GI wire and anchor fastener at every junction and also including cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitably fixed all complete as per direction of Engineer-incharge

Item number
26.6C
Analysis basis
Details of cost for 100 sqm.
Priced inputs
14
Derived rate
4,039.10 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.6C Providing and fixing at all height false ceiling of 4 mm thick phenol bonded Bamboo Mat board (595x595 mm) conforming to IS:13958-1994 including providing and fixing of frame work made of GI angle 25x25x0.4 mm thick all around suitably fixed to wall with the help of dash fastener and hanger frame (600x600 mm c/c) made GI slotted Tee having powder coating on bottom side (30x25x0.3 mm thick for main member & 25x25x0.3 mm for cross member) connected to ceiling with 2.64 mm GI wire and anchor fastener at every junction and also including cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitably fixed all complete as per direction of Engineer-incharge — is derived from 14 priced inputs for 100 sqm and works out to ₹4,039.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Ceiling area = 100sqm, Add wastage @ 5%
  • = 5sqm, Total area = 105 sqm
  • MATERIAL:
  • Weight: (0.595x0.595m of Bamboo board).
  • Total number of board = 297. Total weight of
  • Bamboo board = 297 Nos x 1.31kgs/Nos =
  • 389.07 kgs = 0.39 tonne.
  • Dash hold fasteners 12.5mm dia, 50mm
  • LABOUR:
CodeInputUnitQuantityRate (INR)Amount (INR)
81474mm thick Bamboo Mat Board conforming to IS 13958:19944 mm thick Bamboo Mat Board conforming to IS 13958:1994Materialsqm1051,950.002,04,750.00
2358Carriage of 4mm thick Bamboo mat board and accessoriesCarriage of Bamboo Mat corrugated sheets and accessoriesMaterialtonne0.3917,700.006,903.00
8570GI Main T ceiling section 30x25x0.3 mm (3 metre long) including of wastage of 10%GI Main T ceiling section 30x25x0.3 mm (3 metre long)Materialeach29.5240.007,080.00
8571GI Perimeter wall angle 25x25x0.4 mm (3 metre long) including of wastage of 10%GI Perimeter wall angle 25x25x0.4 mm (3 metre long)Materialeach13.5200.002,700.00
8572GI Intermediate cross T section 25x25x0.3 mm (1.2 metre long) including of wastage of 10% on grid cutoutsGI Intermediate cross T section 25x25x0.3 mm (1.2 metre long)Materialeach14790.0013,230.00
8573GI Intermediate cross T section 25x25x0.3 mm (0.6 metre long) including of wastage of 10% on grid cutoutsGI Intermediate cross T section 25x25x0.3 mm (0.6 metre long)Materialeach14745.006,615.00
8615Hanger rod 4mm thickHanger rod 4 mm thickMaterialeach7211.00792.00
8616Adjustment clip 85x30x0.8mmAdjustment clip 85x30x0.8 mmMaterialeach727.00504.00
7015Soffit cleat (size 27x37x25x1.60mm)Galvanised Steel soffit cleat (Size 27x37x25x0.60 mm)Materialeach723.00216.00
7388long with 6mm dia boltsDash hold fastener 12.5 mm dia, 50 mm long with 6 mm dia boltMaterialeach7210.00720.00
9977Carriage of grid materialsMaterialL.S.89.282.27202.67
9999SundriesMaterialL.S.187.952.27426.65
0112Carpenter 2nd classLabourday28816.0022,848.00
0114BeldarLabourday23736.0016,928.00
TOTAL
2,83,915.32
Add 1 % Water charges on “W”
2,839.15
TOTAL
2,86,754.47
Add GST on “X” (multiplying factor 0.2127)
60,992.68
TOTAL
3,47,747.15
Add 15% CPOH on “Y”
52,162.07
TOTAL
3,99,909.22
Add Cess @ 1% on “Z”
3,999.09
Cost of 100 sqm
4,03,908.31
Cost of 1sqm
4,039.08
Say
4,039.10

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1913. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.