CPWD Analysis of Rates · New Technologies and Materials

Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level

Cement mortar 1:6 (1 cement : 6 coarse sand)

Item number
26.69.1
Analysis basis
Details of cost for 10 cum
Priced inputs
9
Derived rate
9,844.65 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.69.1 Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level Cement mortar 1:6 (1 cement : 6 coarse sand) — is derived from 9 priced inputs for 10 cum and works out to ₹9,844.65 per cum after water charges, GST, CPOH and cess. The full build-up is below.

  • MATERIAL:
  • Cement mortar 1 : 6 (1 cement : 6 coarse sand)
  • Extra labour element required for lifting of
  • materials (above floor two level upto floor
  • five level)
CodeInputUnitQuantityRate (INR)Amount (INR)
8658Precast C&D waste concrete blockMaterial1000 Nos1.10930,100.0033,380.90
Rate as per item No 3.11 of SH: MortarRate as per item 3.11Sub-analysiscum1.133,541.404,001.78
9999SundriesMaterialL.S.27.32.2761.97
0123Mason (brick layer) 1st classMason 1st classLabourday4.7897.004,215.90
0124Mason 2nd classMason 2nd classLabourday4.7816.003,835.20
0115CoolieLabourday18736.0013,248.00
0101BhistiLabourday2816.001,632.00
9999ScaffoldingMaterialL.S.223.62.27507.57
0115CoolieLabourday11.3736.008,316.80
Total
69,200.12
Add 1 % Water charges on “W”
692.00
TOTAL
69,892.12
Add GST on “X” (multiplying factor 0.2127)
14,866.05
TOTAL
84,758.17
Add 15% CPOH on “Y”
12,713.73
TOTAL
97,471.90
Add Cess @ 1% on “Z”
974.72
Cost of 10 cum
98,446.62
Cost of 1 cum
9,844.66
Say
9,844.65

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1998. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.