CPWD Analysis of Rates · New Technologies and Materials
Details of Bare cost of material
- Item number
- 26.48/Sub-AR-1/Sub-AR-3
- Analysis basis
- Details of cost for 110 holes
- Priced inputs
- 8
- Derived rate
- ₹9.00 / holes
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.48/Sub-AR-1/Sub-AR-3 — Details of Bare cost of material — is derived from 8 priced inputs for 110 holes and works out to ₹9.00 per holes after water charges, GST, CPOH and cess. The full build-up is below.
- Bare cost of material of 100 sqm using
- Sub Filling and finishing the holes of varies
- A/R - 2 formwork shuttering while de-shuttering )
- with water in ratio prescribed by manufacturer
- pushing it in the holes upto full depth of
- all complete as per directions of the
- (Assuming 100 to 120 nos holes of
- 0.0001cum to 0.00008 cum size can be
- filled with 8 kg (i/c wastage) of GP-2 compound)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 5783 | M S working platform for aluminium formworkMS working platform for aluminium formworkMaterial | Kg | 270 | 48.00 | 12,960.00 |
| 4009 | M S tube panelMild steel tubes hot finished welded typeMaterial | Kg | 256.25 | 72.00 | 18,450.00 |
| 7343 | Telescopic adjustabe props 3 m ( 2.02-3.75 m)Adjustable telescopic prop 3 m (2.02-3.75 m)Material | each | 30 | 1,051.00 | 31,530.00 |
| 5780 | Aluminium formwork material cost (same as ‘ E ‘ above)4 mm thick sheet of aluminium alloy grade 6061 (type-6) for aluminuum formworkMaterial | Kg | 2,476.32 | 260.00 | 6,43,843.20 |
| 5774 | GP-2 cementitious compoundMaterial | Kg | 8 | 22.00 | 176.00 |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.45 | 816.00 | 367.20 |
| 0114 | BeldarLabour | day | 0.45 | 736.00 | 331.20 |
| 9999 | Sundries for T&P and scaffolding etc.Material | L.S. | 50 | 2.27 | 113.50 |
- Total Bare cost of material for 100 uses
- 7,06,783.20
- Once
- 7,067.83
- Cost of 110 Nos holes
- 987.90
- Cost of each hole
- 8.98
- say
- 9.00
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1975. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works