Providing and fixing hard drawn steel wire fabric of size 75 x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge
Item number
26.40
Analysis basis
10.00 sqm
Priced inputs
6
Derived rate
₹902.55/ SQM
D-01/RATE ANALYSISITEM 26.40
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.40 (Providing and fixing hard drawn steel wire fabric of size 75 x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge) is derived from 6 priced inputs for 10.00 sqm and works out to ₹902.55 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
NOTES
key to be provided at 0.5 mtr centre to centre in each direction
= 25 nos
25x0.10x0.617=1.55 kg
75x25mm, weight 7.75kg/sqm
75x25 mm = 10.00 sqm + Add 5%
wastage = 0.50 sqm Total = 10.50 sqm
Total no. of Shear key of MS Bar in 10sqm
ANALYSIS OF RATES · ITEM 26.40DETAILS OF COST FOR 10.00 SQM ( I.E 77.50 KG.)
Code
Type
Input
Unit
Quantity
Rate (INR)
Amount (INR)
7925
MAT
L shaped 100mm long, 10mm dia mild steel shear keyL shaped 100 mm long, 10 mm dia mild steel shear key
kg
1.55
90.00
139.50
0091
MACH
Welding charges of shear key to existing reinforcement
each
25
5.00
125.00
1021
MAT
Hard drawn steel wire fabricHard drawn steel wire fabric 75 x 25 mm mesh of weight not less than 7.75 kg/sqm
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1961
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1961. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
D-03/ADJACENT ITEMSNEW TECHNOLOGIES AND MATERIALS
ARCHED / ESTIMATING
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.