Skip to main content
R/DAR 2023

Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in

Cement mortar 1:6 (1 cement : 6 Coarse sand)
Item number
6.34.2
Analysis basis
1 cum
Priced inputs
9
Derived rate
₹8,752.55/ CUM
D-01/RATE ANALYSISITEM 6.34.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.34.2 (Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : Cement mortar 1:6 (1 cement : 6 Coarse sand)) is derived from 9 priced inputs for 1 cum and works out to ₹8,752.55 per cum after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Cement mortar 1 : 6 (1 cement : 6 coarse
  • sand)
  • Extra labour element required for lifting of
  • materials above floor two level upto floor
  • V level (0.75 x 1.5 = 1.13)
ANALYSIS OF RATES · ITEM 6.34.2DETAILS OF COST FOR 1 CUM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7737MATFly ash bricks conforming to I.S. 128941000 Nos0.4874,500.002,191.50
SUBRate as per Item Number 3.11 of SH: MortarsRate as per item 3.11cum0.223,541.40779.11
9999MATSundriesL.S.2.732.276.20
0123LABMason 1st classMason 1st classday0.47897.00421.59
0124LABMason 2nd classMason 2nd classday0.47816.00383.52
0115LABCoolieday1.8736.001,324.80
0101LABBhistiday0.2816.00163.20
9999MATScaffoldingL.S.22.362.2750.76
0115LABCoolieday1.13736.00831.68
BUILD-UP TO RATE
TOTAL
6,152.36
Add 1 % Water charges on “W”
+61.52
TOTAL
6,213.88
Add GST on “X” (multiplying factor 0.2127)
+1,321.69
TOTAL
7,535.57
Add 15% CPOH on “Y”
+1,130.34
TOTAL
8,665.91
Add Cess @ 1% on “Z”
+86.66
Cost per cum.
8,752.57
SAY
₹8,752.55
D-02/SOURCEPRINTED PAGE 334
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
334

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 334. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSMASONRY WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.