CPWD Analysis of Rates · Masonry Work
Tile brick masonry with common burnt clay machine moulded tile bricks of class designation 12.5 conforming to IS : 2690 (Part I) in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand)
- Item number
- 6.17
- Analysis basis
- Details of cost for 1 cum.
- Priced inputs
- 7
- Derived rate
- ₹11,328.50 / Cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.17 — Tile brick masonry with common burnt clay machine moulded tile bricks of class designation 12.5 conforming to IS : 2690 (Part I) in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) — is derived from 7 priced inputs for 1 cum and works out to ₹11,328.50 per cum after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7904 | Machine moulded common burnt clay tile bricks of class designation 12.5Material | 1000 Nos | 0.777 | 5,200.00 | 4,040.40 |
| Rate as per Item Number 3.11 of SH: MortarsRate as per item 3.11Sub-analysis | cum | 0.4 | 3,541.40 | 1,416.56 | |
| 9999 | SundriesMaterial | L.S. | 4.55 | 2.27 | 10.33 |
| 0123 | Mason 1st classMason 1st classLabour | day | 0.7 | 897.00 | 627.90 |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.7 | 816.00 | 571.20 |
| 0115 | CoolieLabour | day | 1.54 | 736.00 | 1,133.44 |
| 0101 | BhistiLabour | day | 0.2 | 816.00 | 163.20 |
- TOTAL
- 7,963.03
- Add 1 % Water charges on “W”
- 79.63
- TOTAL
- 8,042.66
- Add GST on “X” (multiplying factor 0.2127)
- 1,710.67
- TOTAL
- 9,753.33
- Add 15% CPOH on “Y”
- 1,463.00
- TOTAL
- 11,216.33
- Add Cess @ 1% on “Z”
- 112.16
- Cost of 1 Cum.
- 11,328.49
- Say
- 11,328.50
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 320. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works