CPWD Analysis of Rates · Masonry Work
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in foundation and plinth in
Cement mortar 1:6 (1 cement : 6 coarse sand)
- Item number
- 6.16.2
- Analysis basis
- Details of cost for 1 cum.
- Priced inputs
- 7
- Derived rate
- ₹10,831.05 / cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.16.2 — Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) — is derived from 7 priced inputs for 1 cum and works out to ₹10,831.05 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- Cement mortar 1 : 6
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1984 | Common burnt clay F.P.S. (non modular) bricks tile class designation 10Common burnt clay F.P.S. bricks tile class designation 10Material | 1000 Nos | 0.777 | 4,750.00 | 3,690.75 |
| Rate as per Item Number 3.11 of SH: MortarsRate as per item 3.11Sub-analysis | cum | 0.4 | 3,541.40 | 1,416.56 | |
| 9999 | SundriesMaterial | L.S. | 4.55 | 2.27 | 10.33 |
| 0123 | Mason 1st classMason 1st classLabour | day | 0.7 | 897.00 | 627.90 |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.7 | 816.00 | 571.20 |
| 0115 | CoolieLabour | day | 1.54 | 736.00 | 1,133.44 |
| 0101 | BhistiLabour | day | 0.2 | 816.00 | 163.20 |
- TOTAL
- 7,613.38
- Add 1 % Water charges on “W”
- 76.13
- TOTAL
- 7,689.51
- Add GST on “X” (multiplying factor 0.2127)
- 1,635.56
- TOTAL
- 9,325.07
- Add 15% CPOH on “Y”
- 1,398.76
- TOTAL
- 10,723.83
- Add Cess @ 1% on “Z”
- 107.24
- Cost for 1 cum.
- 10,831.07
- Say
- 10,831.05
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 320. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.