CPWD Analysis of Rates · Flooring
Size of Tile 600 x 1200 mm
- Item number
- 11.41A.1.3
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 9
- Derived rate
- ₹1,577.15 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.41A.1.3 — Size of Tile 600 x 1200 mm — is derived from 9 priced inputs for 10 sqm and works out to ₹1,577.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Double Charged vitrified floor tiles 60
- x 120 cm size =10 sqm+ Add wastage
- & breakage @2.5% =0.25 sqm. Total =
- 10.25 sqm
- 20 mm thick Cement mortar 1 : 4 (1
- cement : 4 coarse sand)
- Cement for slurry over bed @ 3.3 kg per
- sqm
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2754 | Double charge vitrified tile polished finish of size 60 x 120 cmMaterial | sqm | 10.25 | 563.00 | 5,770.75 |
| 9977 | Carriage of tilesMaterial | L.S. | 62.4 | 2.27 | 141.65 |
| Rate as per Item Number 3.9 of SH: MortarsRate as per item 3.9Sub-analysis | Cum | 0.24 | 4,211.70 | 1,010.81 | |
| 9999 | Mortar for pointing in white cementMaterial | L.S. | 26 | 2.27 | 59.02 |
| 0367 | Portland cementPortland Cement (OPC-43 Grade)Material | tonne | 0.033 | 5,156.00 | 170.15 |
| 9999 | For notch trowel,plier, wedge, clips of required thickness, leveling system and rubber mallet etcMaterial | L.S. | 25 | 2.27 | 56.75 |
| 0123 | Mason 1st classMason 1st classLabour | day | 2 | 897.00 | 1,794.00 |
| 0115 | CoolieLabour | day | 2 | 736.00 | 1,472.00 |
| 9988 | sundries including carriage of quick set polymer etcMaterial | L.S. | 269.1 | 2.27 | 610.86 |
- TOTAL
- 11,085.99
- Add 1% Water charges on “W”
- 110.86
- TOTAL
- 11,196.85
- Add GST on “X” (multiplying factor 0.2127)
- 2,381.57
- TOTAL
- 13,578.42
- Add 15% CPOH on “Y”
- 2,036.76
- TOTAL
- 15,615.18
- Add Cess @ 1% on “Z”
- 156.15
- Cost of 10sqm
- 15,771.33
- Cost of 1sqm
- 1,577.13
- Say
- 1,577.15
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 816. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.