40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar

1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone

Item number
11.29.1
Analysis basis
Details of cost for 10sqm.
Priced inputs
9
Derived rate
1,526.05

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.29.1 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone — is derived from 9 priced inputs and works out to ₹1,526.05 after water charges, GST, CPOH and cess. The full build-up is below.

  • Finished work = 10 sqm
  • Total = 11 sqm
  • Cement mortar 1 : 5 (1 cement : 5 coarse
  • sand)
  • (i) for beading = 0.224 cum+
  • (ii) for joining = 0.026 cum.
  • Total=0.250cum.
  • Cement mortar 1:2 (1 Cement : 2 stone
  • dust for pointing)
  • Add for wastage @ 10% = 1 sqm
CodeInputUnitQuantityRate (INR)Amount (INR)
1164Red sand stone slab 40 mmthick (undressed)Red sand stone slab 40 mm thick (un-dressed)Materialsqm11330.003,630.00
9977CarriageMaterialL.S.34.062.2777.32
Rate as per Item Number 3.10 of SH: MortarsRate as per item 3.10Sub-analysiscum0.253,850.75962.69
Rate as per Item Number 3.12 of SH: MortarsRate as per item 3.12Sub-analysiscum0.0235,252.00120.80
0123Mason 1st classMason 1st classLabourday3.9897.003,498.30
0100BandhaniLabourday1.1816.00897.60
0115CoolieLabourday1.4736.001,030.40
0101BhistiLabourday0.55816.00448.80
9999SundriesMaterialL.S.26.912.2761.09
TOTAL
10,727.00
Add 1 % Water charges on “W”
107.27
TOTAL
10,834.27
Add GST on “X” (multiplying factor 0.2127)
2,304.45
TOTAL
13,138.72
Add 15% CPOH on “Y”
1,970.81
TOTAL
15,109.53
Add Cess @ 1% on “Z”
151.10
Cost for 10sqm.
15,260.63
Cost for 1sqm.
1,526.06
Say
1,526.05

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 801. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.