CPWD Analysis of Rates · Finishing

Extra for addition of synthetic Polyester triangular fibre of length 6 mm, effective diameter 10-40 microns and specific gravity of 1.34 to 1.40 in cement plaster/mortar by using 125 gms. of synthetic Polyester triangular fibre for 50 Kgs. cement used in cement mortar as per directions of Engineer-in-Charge

Item number
13.79
Analysis basis
Detail of cost for per bag of 50 kg of cement
Priced inputs
1
Derived rate
78.35 / per bag

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.79 Extra for addition of synthetic Polyester triangular fibre of length 6 mm, effective diameter 10-40 microns and specific gravity of 1.34 to 1.40 in cement plaster/mortar by using 125 gms. of synthetic Polyester triangular fibre for 50 Kgs. cement used in cement mortar as per directions of Engineer-in-Charge — is derived from 1 priced inputs for per bag and works out to ₹78.35 per per bag after water charges, GST, CPOH and cess. The full build-up is below.

  • used in mortar
CodeInputUnitQuantityRate (INR)Amount (INR)
8733Synthetic ployster triangular fibre of length 6 mm, effective diameter 10-40 microns and specific gravity of 1.34 to 1.40 including labour for mixingSynthetic ployster triangular fibre of length 6 mm, effective diameter 10-40 microns and specific gravity of 1.34 to 1.40Materialkg0.125440.5055.06
TOTAL
55.06
Add 1 % Water charges on “W”
0.55
TOTAL
55.61
Add GST on “X” (multiplying factor 0.2127)
11.83
TOTAL
67.44
Add 15% CPOH on “Y”
10.12
TOTAL
77.56
Add Cess @ 1% on “Z”
0.78
Cost per bag of cement
78.34
Say
78.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1010. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works