CPWD Analysis of Rates · Finishing
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete
On steel work
- Item number
- 13.52.1
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 13
- Derived rate
- ₹241.75 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.52.1 — Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete On steel work — is derived from 13 priced inputs for 10 sqm and works out to ₹241.75 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- PRIMING COAT
- EPOXY PAINTING
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 4202 | Red oxide Zinc chromate primerMaterial | litre | 0.75 | 140.00 | 105.00 |
| 9999 | PuttyMaterial | L.S. | 2.73 | 2.27 | 6.20 |
| 9977 | CarriageMaterial | L.S. | 0.39 | 2.27 | 0.89 |
| 0131 | PainterLabour | day | 0.25 | 816.00 | 204.00 |
| 0115 | CoolieLabour | day | 0.25 | 736.00 | 184.00 |
| 9999 | Brushes, sand paper etcMaterial | L.S. | 5.46 | 2.27 | 12.39 |
| 9999 | SundriesMaterial | L.S. | 10.66 | 2.27 | 24.20 |
| 7239 | Epoxy paintMaterial | litre | 1.25 | 230.00 | 287.50 |
| 9977 | Carriage of materialMaterial | L.S. | 1.43 | 2.27 | 3.25 |
| 0131 | PainterLabour | day | 0.54 | 816.00 | 440.64 |
| 0115 | CoolieLabour | day | 0.54 | 736.00 | 397.44 |
| 9999 | Putty, brushes, sand paper etcMaterial | L.S. | 6.76 | 2.27 | 15.35 |
| 9999 | SundriesMaterial | L.S. | 8.06 | 2.27 | 18.30 |
- TOTAL
- 1,699.16
- Add 1 % Water charges on “W”
- 16.99
- TOTAL
- 1,716.15
- Add GST on “X” (multiplying factor 0.2127)
- 365.03
- TOTAL
- 2,081.18
- Add 15% CPOH on “Y”
- 312.18
- TOTAL
- 2,393.36
- Add Cess @ 1% on “Z”
- 23.93
- Cost of 10.00 sqm
- 2,417.29
- Cost of 1.00 sqm
- 241.73
- Say
- 241.75
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 992. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works