18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge
- Item number
- 13.12
- Analysis basis
- 10 sqm
- Priced inputs
- 6
- Derived rate
- ₹537.45/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.12 (18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge) is derived from 6 priced inputs for 10 sqm and works out to ₹537.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Under layer Cement mortar 1 : 5 (1 cement
- : 5 coarse sand)
- Top layer Cement mortar 1:3 (1 cement : 3
- coarse sand)
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| SUB | Rate as per Item Number 3.10 of SH: MortarsRate as per item 3.10 | cum | 0.144 | 3,850.75 | 554.51 | |
| SUB | Rate as per Item Number 3.8 of SH: MortarsRate as per item 3.8 | cum | 0.072 | 4,881.95 | 351.50 | |
| 0155 | LAB | Mason (average) | day | 1.21 | 857.00 | 1,036.97 |
| 0115 | LAB | Coolie | day | 1.29 | 736.00 | 949.44 |
| 0101 | LAB | Bhisti | day | 1.05 | 816.00 | 856.80 |
| 9999 | MAT | Scaffolding and sundries | L.S. | 12.61 | 2.27 | 28.62 |
- TOTAL
- 3,777.84
- Add 1 % Water charges on “W”
- +37.78
- TOTAL
- 3,815.62
- Add GST on “X” (multiplying factor 0.2127)
- +811.58
- TOTAL
- 4,627.20
- Add 15% CPOH on “Y”
- +694.08
- TOTAL
- 5,321.28
- Add Cess @ 1% on “Z”
- +53.21
- Cost of 10.00 sqm
- 5,374.49
- Cost of 1.00 sqm
- 537.45
- SAY
- ₹537.45
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 963
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 963. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.