CPWD Analysis of Rates · Earth Work

Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete

With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration

Item number
2.35.1.1
Analysis basis
Details of cost for 10 metres
Priced inputs
2
Derived rate
38.90 / metres

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.35.1.1 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration — is derived from 2 priced inputs for 10 metres and works out to ₹38.90 per metres after water charges, GST, CPOH and cess. The full build-up is below.

  • Chlorpyriphos 1% concentration = 10.0x
  • 0.30x7.5 = 22.5 litres
  • Chlorpyriphos 20% required = 22.5/20 =
  • 1.125 litres
  • Chlorpyriphos 20% E.C. / Lindane 20% E.C.
  • 1.125 litres (to be supplied free of cost)
  • (for excavating channel) rodding in chemical
  • spraying the emulssion and refilling the same
CodeInputUnitQuantityRate (INR)Amount (INR)
0114BeldarLabourday0.33736.00242.88
9999Sundries, rent of sprayer etc.MaterialL.S.13.522.2730.69
TOTAL
273.57
Add 1 % Water charges on “W”
2.74
TOTAL
276.31
Add GST on “X” (multiplying factor 0.2127)
58.77
TOTAL
335.08
Add 15% CPOH on “Y”
50.26
TOTAL
385.34
Add Cess @ 1% on “Z”
3.85
Cost for 10 metres
389.19
Cost for 1 metre
38.92
Say
38.90

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 135. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.