CPWD Analysis of Rates · Earth Work
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m
Ordinary rock
- Item number
- 2.30.2
- Analysis basis
- Details of cost for 10 holes-
- Priced inputs
- 2
- Derived rate
- ₹194.25 / hole
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.30.2 — Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m Ordinary rock — is derived from 2 priced inputs for 10 holes and works out to ₹194.25 per hole after water charges, GST, CPOH and cess. The full build-up is below.
- Earth work 10 x 0.3 (avg) = 3.0 cum
- Extra labour for filling and ramming
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Item Number 2.9.1 of SH: Earth WorkRate as per item 2.9.1Sub-analysis | cum | 3 | 632.95 | 1,898.85 | |
| 9999 | SundriesMaterial | L.S. | 13.52 | 2.27 | 30.69 |
- TOTAL
- 1,929.54
- Add 1 % Water charges on “W-A”
- 0.31
- TOTAL
- 1,929.85
- Add GST on “X-A” (multiplying factor 0.2127)
- 6.59
- TOTAL
- 1,936.44
- Add 15% CPOH on “Y-A”
- 5.64
- TOTAL
- 1,942.08
- Add Cess @ 1% on “Z-A”
- 0.43
- Cost of 10 holes
- 1,942.51
- Cost of 1 hole
- 194.25
- Say
- 194.25
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 130. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.