Skip to main content

CPWD Analysis of Rates · Drainage

Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete

1200 mm dia RCC pipes. (Laying by manual/ machanical means)

Item number
19.36.5
Analysis basis
Detail of cost for 10 metre
Priced inputs
7
Derived rate
11,119.35 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.36.5 Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1200 mm dia RCC pipes. (Laying by manual/ machanical means) — is derived from 7 priced inputs for 10 metre and works out to ₹11,119.35 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • Detail for 10 metre
  • MATERIALS :
CodeInputUnitQuantityRate (INR)Amount (INR)
1738RCC pipe 1200 mm dia pipe NP-4 spigotRCC pipe 1200 mm dia NP-4 spigotMaterialmetre106,965.0069,650.00
0367Portland Cement (OPC-43 grade)Materialtonne0.0345,156.00175.30
0983Fine sand (zone IV)Materialcum0.046980.0045.08
0123Mason 1st classMason 1st classLabourday0.795897.00713.12
0124Mason 2nd classMason 2nd classLabourday0.795816.00648.72
0114BeldarLabourday8.67736.006,381.12
0101BhistiLabourday0.67816.00546.72
TOTAL
78,160.06
Add 1 % Water charges on “W”
781.60
TOTAL
78,941.66
Add GST on “X” (multiplying factor 0.2127)
16,790.89
TOTAL
95,732.55
Add 15% CPOH on “Y”
14,359.88
TOTAL
1,10,092.43
Add Cess @ 1% on “Z”
1,100.92
Rate per metre
11,119.34
Say
11,119.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1781. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works