Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately)

Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35

Item number
19.26.4
Analysis basis
Details of cost for one manhole
Priced inputs
4
Derived rate
320.15 / one manhole

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.26.4 Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) : Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35 — is derived from 4 priced inputs for one manhole and works out to ₹320.15 per one manhole after water charges, GST, CPOH and cess. The full build-up is below.

  • Dismantling of C.C slab of 1:2:4 (1 cement 2 coarse sand : 4 aggregate stone
  • 20 mm nominal size)
  • = 3.14/4x(0.985)²x0.15 = 0.114 cum
  • 0.095 cum
  • Net qty= 0.019 cum Say 0.02 cum
  • C.C work 1:2:4 ( 1 cement : 2 coarse
  • sand 4 graded stone aggregate 20 mm
  • nominal size )
  • 3.14/4x(0.985)²x0.15 = 0.114 cum
  • 3.14/4x(0.90)²x0.15 =(-) 0.095 cum
  • Net qty= 0.019 cum Say 0.02 cum
  • Less cover =3.14/4x(0.90)²x0.15 =(-)
  • Less portion cover with frame =
CodeInputUnitQuantityRate (INR)Amount (INR)
Rate as per item no. 15.3 of SH : Dismantling and demolishingRate as per item 15.3Sub-analysiscum0.023,551.2571.03
9999Removal of R.C.C cover and frameMaterialL.S.8.062.2718.30
Rate as per item no 4.1.3 of SH : Concrete WorkRate as per item 4.1.3Sub-analysiscum0.027,878.50157.57
9999SundriesMaterialL.S.20.282.2746.04
TOTAL
292.94
Add 1 % Water charges on “W-A”
0.64
TOTAL
293.58
Add GST on “X-A” (multiplying factor 0.2127)
13.82
TOTAL
307.40
Add 15% CPOH on “Y-A”
11.82
TOTAL
319.22
Add Cess @ 1% on “Z-A”
0.91
Cost of one no
320.13
Say
320.15

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1764. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works