Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for repointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead

Item number
24.1
Analysis basis
10 sqm
Priced inputs
4
Derived rate
₹72.45/ SQM
D-01/RATE ANALYSISITEM 24.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 24.1 (Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for repointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead) is derived from 4 priced inputs for 10 sqm and works out to ₹72.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 24.1DETAIL OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday0.53736.00390.08
0115LABCoolieday0.08736.0058.88
0101LABBhistiday0.07816.0057.12
9999MATSundriesL.S.1.432.273.25
BUILD-UP TO RATE
TOTAL
509.33
Add 1 % Water charges on “W”
+5.09
TOTAL
514.42
Add GST on “X” (multiplying factor 0.2127)
+109.42
TOTAL
623.84
Add 15% CPOH on “Y”
+93.58
TOTAL
717.42
Add Cess @ 1% on “Z”
+7.17
Cost of 10.00 sqm
724.59
Cost of 1.00 sqm
72.46
SAY
₹72.45
D-02/SOURCEPRINTED PAGE 1889
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1889

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1889. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSCONSERVATION OF HERITAGE BUILDINGS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.