CPWD Analysis of Rates · Conservation of Heritage Buildings
Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for repointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead
- Item number
- 24.1
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 4
- Derived rate
- ₹72.45 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 24.1 — Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for repointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead — is derived from 4 priced inputs for 10 sqm and works out to ₹72.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0114 | BeldarLabour | day | 0.53 | 736.00 | 390.08 |
| 0115 | CoolieLabour | day | 0.08 | 736.00 | 58.88 |
| 0101 | BhistiLabour | day | 0.07 | 816.00 | 57.12 |
| 9999 | SundriesMaterial | L.S. | 1.43 | 2.27 | 3.25 |
- TOTAL
- 509.33
- Add 1 % Water charges on “W”
- 5.09
- TOTAL
- 514.42
- Add GST on “X” (multiplying factor 0.2127)
- 109.42
- TOTAL
- 623.84
- Add 15% CPOH on “Y”
- 93.58
- TOTAL
- 717.42
- Add Cess @ 1% on “Z”
- 7.17
- Cost of 10.00 sqm
- 724.59
- Cost of 1.00 sqm
- 72.46
- Say
- 72.45
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1889. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.