Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level

1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA))

Item number
4.1.8A
Analysis basis
Details of cost for 1 cum.
Priced inputs
10
Derived rate
5,205.25 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 4.1.8A Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA)) — is derived from 10 priced inputs for 1 cum and works out to ₹5,205.25 per cum after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0282Recycled Aggregate (RA) 40 mm nominal sizeMaterialcum0.65390.00253.50
0283Recycled Aggregate (RA) 20 mm nominal sizeMaterialcum0.24420.00100.80
0278Manufactured sand derived from Recycled Concrete Aggregate (RCA)Materialcum0.47957.00449.79
0367Portland Cement (0.1175 cum)Portland Cement (OPC-43 Grade)Materialtonne0.175,156.00876.52
0155Mason (average)Labourday0.1857.0085.70
0114BeldarLabourday1.63736.001,199.68
0101BhistiLabourday0.7816.00571.20
0002Hire charges of Concrete Mixer 0.25 to 0.40 cum with hooperHire charges of Concrete Mixer 0.25 to 0.40 cum with HopperMachineryday0.07900.0063.00
0012Vibrator(Needle type 40mm)Vibrator (Needle type 40 mm)Machineryday0.07400.0028.00
9999SundriesMaterialL.S.13.522.2730.69
TOTAL
3,658.88
Add 1 % Water charges on “W”
36.59
TOTAL
3,695.47
Add GST on “X” (multiplying factor 0.2127)
786.03
TOTAL
4,481.50
Add 15% CPOH on “Y”
672.23
TOTAL
5,153.73
Add Cess @ 1% on “Z”
51.54
Cost of 1 cum.
5,205.27
Say
5,205.25

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 157. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.