Providing and fixing bright finished brass parliamentary hinges with necessary screws etc. complete
- Item number
- 9.73.1
- Analysis basis
- 10 nos
- Priced inputs
- 5
- Derived rate
- ₹463.15/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.73.1 (Providing and fixing bright finished brass parliamentary hinges with necessary screws etc. complete : 150x125x27x5 mm) is derived from 5 priced inputs for 10 nos and works out to ₹463.15 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0385 | MAT | Brass parliamentary hinges 150x125x27x5 mm | 10 Nos | 1 | 2,871.00 | 2,871.00 |
| 0450 | MAT | Brass screws 40 mm | 100 Nos | 0.8 | 187.00 | 149.60 |
| 9977 | MAT | Carriage of materials | L.S. | 2.73 | 2.27 | 6.20 |
| 0111 | LAB | Carpenter 1st class | day | 0.14 | 897.00 | 125.58 |
| 0114 | LAB | Beldar | day | 0.14 | 736.00 | 103.04 |
- TOTAL
- 3,255.42
- Add 1 % Water charges on “W”
- +32.55
- TOTAL
- 3,287.97
- Add GST on “X” (multiplying factor 0.2127)
- +699.35
- TOTAL
- 3,987.32
- Add 15% CPOH on “Y”
- +598.10
- TOTAL
- 4,585.42
- Add Cess @ 1% on “Z”
- +45.85
- Cost of 10 nos.
- 4,631.27
- Cost of 1 no
- 463.13
- SAY
- ₹463.15
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 538
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 538. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.