Providing and fixing ISI marked 85x42 mm oxidised M.S. pull bolt lock conforming to IS : 7534 with necessary screws bolts, nut and washers etc. complete (Copper oxidised as per IS 1378)
- Item number
- 9.64
- Analysis basis
- 10 nos
- Priced inputs
- 3
- Derived rate
- ₹122.15/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.64 (Providing and fixing ISI marked 85x42 mm oxidised M.S. pull bolt lock conforming to IS : 7534 with necessary screws bolts, nut and washers etc. complete (Copper oxidised as per IS 1378)) is derived from 3 priced inputs for 10 nos and works out to ₹122.15 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 2449 | MAT | Oxidised mild steel pull bolt lock (locking bolt) of size 85 mm x 42 mm with screws,bolts,nuts and washers completeOxidised mild steel pull bolt lock (locking bolt) of size 85 mm x 42 mm with screws, bolts, nuts and washers complete | each | 10 | 64.00 | 640.00 |
| 9988 | MAT | Carriage of materials & sundries | L.S. | 6.37 | 2.27 | 14.46 |
| 0112 | LAB | Carpenter 2nd class | day | 0.25 | 816.00 | 204.00 |
- TOTAL
- 858.46
- Add 1 % Water charges on “W”
- +8.58
- TOTAL
- 867.04
- Add GST on “X” (multiplying factor 0.2127)
- +184.42
- TOTAL
- 1,051.46
- Add 15% CPOH on “Y”
- +157.72
- TOTAL
- 1,209.18
- Add Cess @ 1% on “Z”
- +12.09
- Cost of 10 nos.
- 1,221.27
- Cost of 1 no.
- 122.13
- SAY
- ₹122.15
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 525
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 525. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.