Skip to main content
R/DAR 2023

Extra for providing vision panel not exceeding 0.1 sqm in all type of flush doors (cost of glass excluded) (overall area of door shutter to be measured)

Circular
Item number
9.24.2
Analysis basis
1 sqm
Priced inputs
1
Derived rate
₹206.30/ SQM
D-01/RATE ANALYSISITEM 9.24.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.24.2 (Extra for providing vision panel not exceeding 0.1 sqm in all type of flush doors (cost of glass excluded) (overall area of door shutter to be measured): Circular) is derived from 1 priced inputs for 1 sqm and works out to ₹206.30 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 9.24.2DETAILS OF COST FOR 1 SQM. OF DOOR AREA
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0754MATCircular vision panel (upto 0.10 sqm) in Block board construction flush doorCircular vision panel in Block board construction flush door sqm of doorarea1145.00145.00
BUILD-UP TO RATE
TOTAL
145.00
Add 1 % Water charges on “W”
+1.45
TOTAL
146.45
Add GST on “X” (multiplying factor 0.2127)
+31.15
TOTAL
177.60
Add 15% CPOH on “Y”
+26.64
TOTAL
204.24
Add Cess @ 1% on “Z”
+2.04
Cost for 1 sqm.
206.28
SAY
₹206.30
D-02/SOURCEPRINTED PAGE 478
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
478

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 478. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSWOOD AND PVC WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.