Deduct for providing pin headed glass panes instead of ordinary float glass panes 4 mm thick (weight not less than 10 kg per sqm) in doors, windows and clerestory windows shutters (Area of opening for glass panes excluding portion inside rebate shall be measured)
- Item number
- 9.13
- Priced inputs
- 2
- Derived rate
- ₹73.95/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.13 (Deduct for providing pin headed glass panes instead of ordinary float glass panes 4 mm thick (weight not less than 10 kg per sqm) in doors, windows and clerestory windows shutters (Area of opening for glass panes excluding portion inside rebate shall be measured)) is derived from 2 priced inputs and works out to ₹73.95 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Cost for 1 sqm.
- Deduct
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 2406 | MAT | Float glass sheet of nominal thickness 4 mm (weight not less than 10kg/sqm)Float glass panes of nominal thickness 4 mm (weight not less than 10 kg/sqm) | sqm | -1 | 321.00 | -321.00 |
| 7451 | MAT | Glass sheet (Pin headed) 4 mm thick | sqm | 1 | 373.00 | 373.00 |
- TOTAL
- 52.00
- Add 1 % Water charges on “W”
- +0.52
- TOTAL
- 52.52
- Add GST on “X” (multiplying factor 0.2127)
- +11.17
- TOTAL
- 63.69
- Add 15% CPOH on “Y”
- +9.55
- TOTAL
- 73.24
- Add Cess @ 1% on “Z”
- +0.73
- Cost of 1 sqm.
- 73.97
- SAY
- ₹73.95
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 464
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 464. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.