Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately)
- Item number
- 9.1.1
- Analysis basis
- Chowkhat of
- Priced inputs
- 3
- Derived rate
- ₹1,42,949.70/ CHOWKHAT OF
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.1.1 (Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately) Second class teak wood) is derived from 3 priced inputs for Chowkhat of and works out to ₹1,42,949.70 per chowkhat of after water charges, GST, CPOH and cess. The full build-up is below.
- 206.75x117.5cm
- (36 cudm)
- Superior class teakwood such as Dandeli Balarshah or Malabar
- 2x206.75x9.5x7.0cm =0.028cum+
- 1x117.5x9.5x7.0cm = 0.008cum. = 0.036cum.+
- Grand Total = 0.038cum = 38 cudm
- Add for wastage @ 5% = 0.002cum.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1189 | MAT | Second class teak wood in scantling | 10 cudm | 3.8 | 776.00 | 2,948.80 |
| 0156 | LAB | Carpenter (average) | day | 0.72 | 857.00 | 617.04 |
| 0114 | LAB | Beldar | day | 0.07 | 736.00 | 51.52 |
- TOTAL
- 3,617.36
- Add 1 % Water charges on “W”
- +36.17
- TOTAL
- 3,653.53
- Add GST on “X” (multiplying factor 0.2127)
- +777.11
- TOTAL
- 4,430.64
- Add 15% CPOH on “Y”
- +664.60
- TOTAL
- 5,095.24
- Add Cess @ 1% on “Z”
- +50.95
- Cost of 36 cudm.
- 5,146.19
- Cost per cum.
- 1,42,949.72
- SAY
- ₹1,42,949.70
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 435
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 435. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.