Providing, laying, jointing and testing S&S Centrifugally Cast Ductile Iron double chamber Class K-9 pressure pipes conforming to IS 8329:2000 with restrained joints (bolt less), all complete

900 mm nominal dia pipe

Item number
18.72A.14
Analysis basis
Details of cost for 10 metre
Priced inputs
6
Derived rate
29,836.95 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.72A.14 Providing, laying, jointing and testing S&S Centrifugally Cast Ductile Iron double chamber Class K-9 pressure pipes conforming to IS 8329:2000 with restrained joints (bolt less), all complete 900 mm nominal dia pipe — is derived from 6 priced inputs for 10 metre and works out to ₹29,836.95 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • 900 mm dia Centrifugally Cast Ductile Iron
  • restrained joint class K9 pipes (in 5.5 m
  • lengths)
  • Weight of 1 m pipes = 337.35 Kg
  • Weight of 10 m pipes=3373.50 Kg
  • Labour for laying and jointing
CodeInputUnitQuantityRate (INR)Amount (INR)
7604Centrifugally Cast DI class K9 pipe including double chamber restraining arrangements (bolt less) 900 mm nominal dia pipeCentrifugally Cast DI class K9 pipe including double chamber restraining arrangements (bolt less) 900 mm nominal dia pipeMaterialmetre1019,824.001,98,240.00
7619Rubber Gasketof EPDM quality for 900 mm nominal dia pipeMaterialeach2910.001,820.00
0116Fitter (grade 1)Labourday1.09897.00977.73
0117Assistant Fitter or 2nd class FitterLabourday2.18816.001,778.88
0114BeldarLabourday9.09736.006,690.24
9999SundriesMaterialL.S.98.222.27222.96
TOTAL
2,09,729.81
Add 1 % Water charges on “W”
2,097.30
TOTAL
2,11,827.11
Add GST on “X” (multiplying factor 0.2127)
45,055.63
TOTAL
2,56,882.74
Add 15% CPOH on “Y”
38,532.41
TOTAL
2,95,415.15
Add Cess @ 1% on “Z”
2,954.15
Cost of 10 metre
2,98,369.30
Cost of 1.00 metre
29,836.93
Say
29,836.95

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1557. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.