Skip to main content
R/DAR 2023

Providing and fixing PTMT Ball cock of approved quality, colour and make complete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball

25 mm nominal bore, 152mm long, weighing not less than 440 gms
Item number
18.62.3
Analysis basis
one no
Priced inputs
2
Derived rate
₹523.80/ ONE NO
D-01/RATE ANALYSISITEM 18.62.3

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.62.3 (Providing and fixing PTMT Ball cock of approved quality, colour and make complete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball 25 mm nominal bore, 152mm long, weighing not less than 440 gms) is derived from 2 priced inputs for one no and works out to ₹523.80 per one no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 18.62.3DETAILS OF COST FOR ONE NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7497MATPTMT Ball Cock 25mm Complete with Epoxy Coated Aluminium Road & H.D. BallPTMT Ball Cock 25 mm complete with Epoxy Coated Aluminium Rod & H.D. Balleach1295.00295.00
9988MATCarriage of materials and fixing chargesL.S.32.242.2773.18
BUILD-UP TO RATE
TOTAL
368.18
Add 1 % Water charges on “W”
+3.68
TOTAL
371.86
Add GST on “X” (multiplying factor 0.2127)
+79.09
TOTAL
450.95
Add 15% CPOH on “Y”
+67.64
TOTAL
518.59
Add Cess @ 1% on “Z”
+5.19
Cost of one no.
523.78
SAY
₹523.80
D-02/SOURCEPRINTED PAGE 1517
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1517

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1517. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSWATER SUPPLY
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.