Skip to main content

CPWD Analysis of Rates · Water Supply

Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 200 mm diameter

Class I

Item number
18.31.4.1
Analysis basis
Details of cost for 10 sluice valves
Priced inputs
3
Derived rate
13,554.70 / valve

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.31.4.1 Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 200 mm diameter Class I — is derived from 3 priced inputs for 10 sluice and works out to ₹13,554.70 per valve after water charges, GST, CPOH and cess. The full build-up is below.

  • Carriage of sluice valves
  • wt. = 121.5x10=1215kg = 1.215t. say
  • 1.22t
  • Providing flanged joints to sluice valves
  • with bolts, nuts and rubber insertion etc.
CodeInputUnitQuantityRate (INR)Amount (INR)
1943C.I.sluice valve (with caps) class I : 200 mm diaC.I. sluice valve (with caps) class I : 200 mm diaMaterialeach108,360.0083,600.00
(Rate as per item No. 18.24 Of SH: Water Supply)Rate as per item 18.24Sub-analysisquintal12.15661.858,041.48
(Rate as per item No.18.30.5 Of SH: Water Supply)Rate as per item 18.30.5Sub-analysiseach20428.658,573.00
TOTAL
1,00,214.48
Add 1 % Water charges on “W-A”
836.00
TOTAL
1,01,050.48
Add GST on “X-A” (multiplying factor 0.2127)
17,959.54
TOTAL
1,19,010.02
Add 15% CPOH on “Y-A”
15,359.33
TOTAL
1,34,369.35
Add Cess @ 1% on “Z-A”
1,177.55
Cost of 10 valves
1,35,546.90
Cost of 1 valve
13,554.69
Say
13,554.70

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1470. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works