Providing and fixing Polyethelene-Aluminium-Polyethelene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK - EXPOSED ON WALL
- Item number
- 18.1.5
- Analysis basis
- 10 metre
- Priced inputs
- 5
- Derived rate
- ₹684.45/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.1.5 (Providing and fixing Polyethelene-Aluminium-Polyethelene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK - EXPOSED ON WALL 3240 (40 mm OD) pipe) is derived from 5 priced inputs for 10 metre and works out to ₹684.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- 30 x P / 100
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8304 | MAT | 3240 mm PE-AL-PE Composit pressure pipe3240 mm PE-AL-PE Composite pressure pipe | metre | 10 | 190.00 | 1,900.00 |
| 9999 | MAT | Cement, sand and grit | L.S. | 5.33 | 2.27 | 12.10 |
| 0116 | LAB | Fitter (grade 1) | day | 0.33 | 897.00 | 296.01 |
| 0117 | LAB | Assistant Fitter or 2nd class Fitter | day | 1.31 | 816.00 | 1,068.96 |
| 0114 | LAB | Beldar | day | 1.31 | 736.00 | 964.16 |
- Add 30% for fittings and wastage etc. on (P)
- +570.00
- TOTAL
- 4,811.23
- Add 1 % Water charges on “W”
- +48.11
- TOTAL
- 4,859.34
- Add GST on “X” (multiplying factor 0.2127)
- +1,033.58
- TOTAL
- 5,892.92
- Add 15% CPOH on “Y”
- +883.94
- TOTAL
- 6,776.86
- Add Cess @ 1% on “Z”
- +67.77
- Cost of 10 metre
- 6,844.63
- Cost of 1 metre
- 684.46
- SAY
- ₹684.45
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1397
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1397. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.