CPWD Analysis of Rates · Steel Work
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
- Item number
- 10.1
- Analysis basis
- Details of cost for one qunital
- Priced inputs
- 6
- Derived rate
- ₹117.35 / Kg
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 10.1 — Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete — is derived from 6 priced inputs for one qunital and works out to ₹117.35 per kg after water charges, GST, CPOH and cess. The full build-up is below.
- Steel = 1.00q
- Total = 1.05q
- Priming Coat
- Add wastage @ 5% = 0.05q
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1007 | Structurals such as tees,angles channels and R.S. joistsStructural steel such as tees, angles channels and R.S. joistsMaterial | quintal | 1.05 | 5,965.00 | 6,263.25 |
| 0116 | Fitter (grade 1)Labour | day | 0.5 | 897.00 | 448.50 |
| 0103 | Blacksmith 2nd classLabour | day | 0.75 | 816.00 | 612.00 |
| 0114 | BeldarLabour | day | 1 | 736.00 | 736.00 |
| Rate as per Item Number 13.50.3 of SH:FinishingRate as per item 13.50.3Sub-analysis | sqm | 3 | 67.40 | 202.20 | |
| 9999 | SundriesMaterial | L.S. | 20.67 | 2.27 | 46.92 |
- TOTAL
- 8,308.87
- Add 1 % Water charges on “W-A”
- 81.07
- TOTAL
- 8,389.94
- Add GST on “X-A” (multiplying factor 0.2127)
- 1,741.53
- TOTAL
- 10,131.47
- Add 15% CPOH on “Y-A”
- 1,489.39
- TOTAL
- 11,620.86
- Add Cess @ 1% on “Z-A”
- 114.19
- Cost of 1qunital
- 11,735.05
- Cost of 1 Kg.
- 117.35
- Say
- 117.35
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 713. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.