Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete Flexible pipe

32 mm dia
Item number
17.28.2.1
Analysis basis
one no
Priced inputs
2
Derived rate
₹119.55/ ONE NO
D-01/RATE ANALYSISITEM 17.28.2.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.28.2.1 (Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete Flexible pipe 32 mm dia) is derived from 2 priced inputs for one no and works out to ₹119.55 per one no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 17.28.2.1DETAILS OF COST FOR ONE NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7119MATFlexible (coil shaped) PVC waste pipe for sink and wash basin 32 mm dia with length not less than 700 mm i/c PVC waste fittingseach138.0038.00
9988MATCarriage of materials and fixing chargesL.S.20.282.2746.04
BUILD-UP TO RATE
TOTAL
84.04
Add 1 % Water charges on “W”
+0.84
TOTAL
84.88
Add GST on “X” (multiplying factor 0.2127)
+18.05
TOTAL
102.93
Add 15% CPOH on “Y”
+15.44
TOTAL
118.37
Add Cess @ 1% on “Z”
+1.18
Cost of each
119.55
SAY
₹119.55
D-02/SOURCEPRINTED PAGE 1322
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1322

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1322. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.