Skip to main content
R/DAR 2023

Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively

Item number
17.23
Analysis basis
one no
Priced inputs
4
Derived rate
₹1,648.95/ ONE NO
D-01/RATE ANALYSISITEM 17.23

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.23 (Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively) is derived from 4 priced inputs for one no and works out to ₹1,648.95 per one no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 17.23DETAILS OF COST FOR ONE NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1913MATVitreous china lipped front urinaleach1517.00517.00
9977MATCarriage of materialsL.S.9.492.2721.54
0116LABFitter (grade 1)day0.38897.00340.86
0114LABBeldarday0.38736.00279.68
BUILD-UP TO RATE
TOTAL
1,159.08
Add 1 % Water charges on “W”
+11.59
TOTAL
1,170.67
Add GST on “X” (multiplying factor 0.2127)
+249.00
TOTAL
1,419.67
Add 15% CPOH on “Y”
+212.95
TOTAL
1,632.62
Add Cess @ 1% on “Z”
+16.33
Cost of each
1,648.95
SAY
₹1,648.95
D-02/SOURCEPRINTED PAGE 1316
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1316

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1316. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSSANITARY INSTALLATIONS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.