Providing and laying semidense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge

25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity
Item number
16.56.1
Analysis basis
195 cum
Priced inputs
16
Derived rate
₹277.70/ CUM
D-01/RATE ANALYSISITEM 16.56.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.56.1 (Providing and laying semidense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity) is derived from 16 priced inputs for 195 cum and works out to ₹277.70 per cum after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Area covered for 25 mm thickness=7800
  • sqm
  • 5% of 450 MT = 22.50 MT
  • Weight of mix = 205 * 2.5 = 450 tonnes
  • Aggregate
  • Total weight of mix = 450 tonnes Weight of
  • bitumen = 15.75 tonnes
  • Weight of aggregate = 450 -15.75 = 434.25
  • tonnes
  • Taking density of aggregate = 1.5 tonne/cum
  • Volume of aggregate =434.25/1.5
  • =289.50cum
  • Grading - II/19 mm (Nominal Size)
  • 25 - 10mm size = 40% of 289.50 = 115.8 cum
  • 10 - 5mm size = 40% of 289.50 = 115.8 cum
  • 5mm and below = 20% of 289.50 = 57.9 cum
  • Qty = 162.45 * 50 /100
  • Qty = 162.45 * 50 /100
  • Qty = 285 * 41 /100
  • Lime Filler @ 2% ( percentage by weight of
  • aggregate)
  • @75tonne per hour actual output
  • @75tonne per hour actual output
  • @75tonne per hour actual output
  • Topper 10 tonne capacity (Taken 10km
  • avarage lead)
  • 450x10=4500 tonne km
  • for initial break down rolling.(6*0.65)
  • for intermediate rolling.(6*0.65)
  • Finish rolling with 6-8 tonnes smooth
  • wheeled tandem roller.(6*0.65)
  • working with HMP, mechanical broom,
  • paver, roller, asphalt cutter and assistance
  • for setting out lines, levels and layout of
  • construction for checking line & levels
ANALYSIS OF RATES · ITEM 16.56.1DETAILS OF COST FOR 195 CUM (450 TONNES)
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7309MATPaving Asphalt VG-30 of approved qualityPaving Asphalt of grade VG-30 of approved qualitytonne22.541,202.009,27,045.00
0296MATStone Aggregate (Single size) : 12.5 mm nominal sizecum81.2251,400.001,13,715.00
0297MATStone Aggregate (Single size) : 10 mm nominal sizecum81.2251,400.001,13,715.00
2903MATStone chippings/ screenings 4.75 mm nominal size nominal sizeStone chippings/ screenings 4.75 mm nominal sizecum116.851,600.001,86,960.00
0777MATDry hydrated lime (factory made)quintal85.5315.0026,932.50
0062MACHHot mix Plant -120 TPH capacityhour316,800.0050,400.00
0063MACHHot mix Plant 100 TPH Capacityhour314,550.0043,650.00
0064MACHPaver finisher Hydrostatic with sensor control 100 TPHhour61,700.0010,200.00
0069MACHGenerator 250 KVAhour6450.002,700.00
0052MACHFront end loader 1 cum bucket capacity (incl POL)hour61,450.008,700.00
0053MACHTipper -5 CumTipper-5 Cum/10 tonnestonne km4,5003.7016,650.00
0055MACHSmooth Wheeled Roller 8 to 10 tonnehour3.9350.001,365.00
0054MACHVibratory roller 8 to 10 tonnehour3.9700.002,730.00
0056MACHTandem Road Rollerhour3.91,350.005,265.00
0128LABMateday0.84816.00685.44
0114LABBeldarday14736.0010,304.00
BUILD-UP TO RATE
Add 10 per cent of cost of carriage to cover cost of loading and unloading
+1,665.00
TOTAL
15,22,681.94
Add 1 % Water charges on “W”
+15,226.82
TOTAL
15,37,908.76
Add GST on “X” (multiplying factor 0.2127)
+3,27,113.19
TOTAL
18,65,021.95
Add 15% CPOH on “Y”
+2,79,753.29
TOTAL
21,44,775.24
Add Cess @ 1% on “Z”
+21,447.75
Cost for 7800 Sqm
21,66,222.99
Cost per sqm
277.72
SAY
₹277.70
D-02/SOURCEPRINTED PAGE 1227
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1227

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1227. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.