Providing round the clock security guard with gun for watch & ward of Government premises and its all belongings by deploying neatly dressed security guards in 8 hour’s shift including necessary T&P like torch, lathi and uniform etc.complete, as per the direction of Engineer-incharge.(One job means 8 hour’s duty)
- Item number
- 14.94
- Analysis basis
- 1 job
- Priced inputs
- 2
- Derived rate
- ₹1,416.50/ JOB
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.94 (Providing round the clock security guard with gun for watch & ward of Government premises and its all belongings by deploying neatly dressed security guards in 8 hour’s shift including necessary T&P like torch, lathi and uniform etc.complete, as per the direction of Engineer-incharge.(One job means 8 hour’s duty)) is derived from 2 priced inputs for 1 job and works out to ₹1,416.50 per job after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0165 | LAB | Security guard (with gun)Security guard with gun (8 hours shift duty per day) | day | 1 | 973.00 | 973.00 |
| 9999 | MAT | Lathi,torch,uniform,wooden stick & other miscellaneous items | L.S. | 10 | 2.27 | 22.70 |
- TOTAL
- 995.70
- Add 1 % Water charges on “W”
- +9.96
- TOTAL
- 1,005.66
- Add GST on “X” (multiplying factor 0.2127)
- +213.90
- TOTAL
- 1,219.56
- Add 15% CPOH on “Y”
- +182.93
- TOTAL
- 1,402.49
- Add Cess @ 1% on “Z”
- +14.02
- Cost of 1 job
- 1,416.51
- SAY
- ₹1,416.50
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1096
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1096. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.