Skip to main content
R/DAR 2023

Renewing glass panes and refixing existing wooden fillets

Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm)
Item number
14.7.1
Analysis basis
10 glasses
Priced inputs
7
Derived rate
₹1,227.30/ SQM
D-01/RATE ANALYSISITEM 14.7.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.7.1 (Renewing glass panes and refixing existing wooden fillets: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm)) is derived from 7 priced inputs for 10 glasses and works out to ₹1,227.30 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • 0.1sqm.
  • 1.00 sqm + 10% wastage= 1.10 Sqm
ANALYSIS OF RATES · ITEM 14.7.1DETAIL OF COST FOR 10 GLASSES AREA EACH
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
2406MATFloat glass sheet of nominal thickness 4 mm (weight not less than 10kg/sqm)Float glass panes of nominal thickness 4 mm (weight not less than 10 kg/sqm)sqm1.1321.00353.10
9977MATCarriage of glasspanes and other materialsL.S.2.732.276.20
9999MATSundries Nails etc.L.S.9.882.2722.43
9999MATMethylated spiritL.S.5.332.2712.10
0119LABGlazierday0.3816.00244.80
0114LABBeldarday0.3736.00220.80
9999MATSundriesL.S.1.432.273.25
BUILD-UP TO RATE
TOTAL
862.68
Add 1 % Water charges on “W”
+8.63
TOTAL
871.31
Add GST on “X” (multiplying factor 0.2127)
+185.33
TOTAL
1,056.64
Add 15% CPOH on “Y”
+158.50
TOTAL
1,215.14
Add Cess @ 1% on “Z”
+12.15
Cost of 1.00 sqm
1,227.29
SAY
₹1,227.30
D-02/SOURCEPRINTED PAGE 1045
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1045

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1045. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSREPAIRS TO BUILDINGS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.