Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-incharge
- Item number
- 23.5
- Analysis basis
- 1 cum
- Priced inputs
- 3
- Derived rate
- ₹1,509.80/ CUM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 23.5 (Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-incharge) is derived from 3 priced inputs for 1 cum and works out to ₹1,509.80 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- including carriage
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 7753 | MAT | Boulder 50 mm to 200 mmStone Boulder 50 mm to 200 mm | cum | 1 | 875.00 | 875.00 |
| 0114 | LAB | Beldar | day | 0.25 | 736.00 | 184.00 |
| 9999 | MAT | Sundries | L.S. | 1 | 2.27 | 2.27 |
- TOTAL
- 1,061.27
- Add 1 % Water charges on “W”
- +10.61
- TOTAL
- 1,071.88
- Add GST on “X” (multiplying factor 0.2127)
- +227.99
- TOTAL
- 1,299.87
- Add 15% CPOH on “Y”
- +194.98
- TOTAL
- 1,494.85
- Add Cess @ 1% on “Z”
- +14.95
- Cost of 1 Cum.
- 1,509.80
- SAY
- ₹1,509.80
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1877
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1877. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.