CPWD Analysis of Rates · Rain Water Harvesting & Tube Wells

Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel screwed and socketed/plain ended casing pipes of required dia, conforming to IS: 4270, of reputed & approved make, including painted with outside surface with two coats of anticorrosive paint of approved brand and manufacture, including required hire & labour charges, fittings & accessories, all complete, for all depths, as per direction of Engineer-in-charge

150 mm nominal size dia having minimum wall thickness 5.00 mm

Item number
23.10.2
Analysis basis
Details of cost for 30 metre
Priced inputs
5
Derived rate
1,972.25 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 23.10.2 Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel screwed and socketed/plain ended casing pipes of required dia, conforming to IS: 4270, of reputed & approved make, including painted with outside surface with two coats of anticorrosive paint of approved brand and manufacture, including required hire & labour charges, fittings & accessories, all complete, for all depths, as per direction of Engineer-in-charge 150 mm nominal size dia having minimum wall thickness 5.00 mm — is derived from 5 priced inputs for 30 metre and works out to ₹1,972.25 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • including loading and unloading Painting with
  • Anticorrosive Paint 3.14 x0.160x30.00=15.07
  • sqm.
CodeInputUnitQuantityRate (INR)Amount (INR)
7743M.S. pipe 150 mm dia casing pipeMaterialmetre301,250.0037,500.00
7765M.S. socket 150 mm diaMaterialeach5225.001,125.00
Rate as per Item No.13.65.1 of SH:FinishingRate as per item 13.65.1Sub-analysissqm15.07140.252,113.57
0114BeldarLabourday1.4736.001,030.40
0130MistryLabourday0.5897.00448.50
TOTAL
42,217.47
Add 1 % Water charges on “W-A”
401.04
TOTAL
42,618.51
Add GST on “X-A” (multiplying factor 0.2127)
8,615.40
TOTAL
51,233.91
Add 15% CPOH on “Y-A”
7,368.05
TOTAL
58,601.96
Add Cess @ 1% on “Z-A”
564.88
Cost for 30 metre
59,166.84
Cost of 1 metre
1,972.23
Say
1,972.25

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1879. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.