Skip to main content
R/DAR 2023

Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in

Cement mortar 1:3 (1 cement : 3 coarse sand)
Item number
6.12.1
Analysis basis
10 sqm
Priced inputs
7
Derived rate
₹931.75/ SQM
D-01/RATE ANALYSISITEM 6.12.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.12.1 (Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : Cement mortar 1:3 (1 cement : 3 coarse sand)) is derived from 7 priced inputs for 10 sqm and works out to ₹931.75 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Cement mortar 1:3
ANALYSIS OF RATES · ITEM 6.12.1DETAILS OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
2602MATCommon burnt clay F.P.S. (non modular) bricks class designation 7.51000 Nos0.5654,724.002,669.06
SUBCement mortar 1:3 (1 cement : 3 coarse sand) (Rate as per item No 3.8)Rate as per item 3.8cum0.284,881.951,366.95
9999MATSundries & ScaffoldingL.S.13.522.2730.69
0123LABMason 1st classMason 1st classday0.45897.00403.65
0124LABMason 2nd classMason 2nd classday0.45816.00367.20
0115LABCoolieday1.55736.001,140.80
0101LABBhistiday0.7816.00571.20
BUILD-UP TO RATE
TOTAL
6,549.55
Add 1 % Water charges on “W”
+65.50
TOTAL
6,615.05
Add GST on “X” (multiplying factor 0.2127)
+1,407.02
TOTAL
8,022.07
Add 15% CPOH on “Y”
+1,203.31
TOTAL
9,225.38
Add Cess @ 1% on “Z”
+92.25
Cost for 10 sqm.
9,317.63
Cost for 1 sqm.
931.76
SAY
₹931.75
D-02/SOURCEPRINTED PAGE 316
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
316

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 316. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSMASONRY WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.