Skip to main content
R/DAR 2023

Deduct for not grouting the joints with white cement and matching pigment in the items of fixing of vitrified tiles

Item number
11.50
Analysis basis
1 sqm
Priced inputs
2
Derived rate
₹13.30/ SQM
D-01/RATE ANALYSISITEM 11.50

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.50 (Deduct for not grouting the joints with white cement and matching pigment in the items of fixing of vitrified tiles) is derived from 2 priced inputs for 1 sqm and works out to ₹13.30 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 11.50DETAILS OF COST FOR 1 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
9999MATMortar for pointing in white cement with matching pigmentL.S.3.122.277.08
9999MATLABOURL.S.12.272.27
BUILD-UP TO RATE
TOTAL
9.35
Add 1 % Water charges on “W”
+0.09
TOTAL
9.44
Add GST on “X” (multiplying factor 0.2127)
+2.01
TOTAL
11.45
Add 15% CPOH on “Y”
+1.72
TOTAL
13.17
Add Cess @ 1% on “Z”
+0.13
Cost for 1 sqm
13.30
SAY
₹13.30
D-02/SOURCEPRINTED PAGE 840
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
840

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 840. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSFLOORING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.