CPWD Analysis of Rates · Flooring
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with
Agaria White
- Item number
- 11.23.3
- Analysis basis
- Details of cost for 10 sqm.
- Priced inputs
- 10
- Derived rate
- ₹3,164.80 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.23.3 — Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with : Agaria White — is derived from 10 priced inputs for 10 sqm and works out to ₹3,164.80 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- 20mm thick marble slab = 10.00sqm.+
- Total = 11.50sqm.
- Base Cement mortar 1 : 4 (1 cement : 4
- coarse sand)
- Cement for slurry @ 4.4kg sqm.
- (i) for bedding = 44 kg+
- (ii) for jointing = 6 kg.
- Total = 50 kg
- (for finishing, polishing and fixing)
- Add for wastage 15% = 1.50sqm.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7850 | Agaria White marble slab plain 18mm thickAgaria White marble slab plain 18 mm thickMaterial | sqm | 11.5 | 1,100.00 | 12,650.00 |
| Rate as per Item Number 3.9 of SH: MortarsRate as per item 3.9Sub-analysis | cum | 0.224 | 4,211.70 | 943.42 | |
| 0367 | Portland CementPortland Cement (OPC-43 Grade)Material | tonne | 0.05 | 5,156.00 | 257.80 |
| 9977 | Carriage of marble slabMaterial | L.S. | 26.91 | 2.27 | 61.09 |
| 0123 | Mason 1st classMason 1st classLabour | day | 1.2 | 897.00 | 1,076.40 |
| 0114 | BeldarLabour | day | 1 | 736.00 | 736.00 |
| 0115 | CoolieLabour | day | 1 | 736.00 | 736.00 |
| 0139 | Skilled Beldar (for floor rubbing etc.)Labour | day | 5 | 816.00 | 4,080.00 |
| 0013 | Machine for rubbing of floorsMachinery | day | 4 | 350.00 | 1,400.00 |
| 9988 | Sundries and carriage of cement etc.Material | L.S. | 134.55 | 2.27 | 305.43 |
- TOTAL
- 22,246.14
- Add 1 % Water charges on “W”
- 222.46
- TOTAL
- 22,468.60
- Add GST on “X” (multiplying factor 0.2127)
- 4,779.07
- TOTAL
- 27,247.67
- Add 15% CPOH on “Y”
- 4,087.15
- TOTAL
- 31,334.82
- Add Cess @ 1% on “Z”
- 313.35
- Cost of 10 sqm.
- 31,648.17
- Cost of 1 sqm.
- 3,164.82
- Say
- 3,164.80
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 794. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.