Polishing on wood work with ready mixed wax polish of approved brand and manufacture
- Item number
- 13.69.1
- Analysis basis
- 10 sqm
- Priced inputs
- 6
- Derived rate
- ₹197.65/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.69.1 (Polishing on wood work with ready mixed wax polish of approved brand and manufacture : New work) is derived from 6 priced inputs for 10 sqm and works out to ₹197.65 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0855 | MAT | Wax polish (ready made) | kilogram | 0.5 | 242.00 | 121.00 |
| 9977 | MAT | Carriage | L.S. | 0.39 | 2.27 | 0.89 |
| 0131 | LAB | Painter | day | 0.8 | 816.00 | 652.80 |
| 0115 | LAB | Coolie | day | 0.8 | 736.00 | 588.80 |
| 9999 | MAT | Soap, brushes, cloth etc | L.S. | 4.16 | 2.27 | 9.44 |
| 9999 | MAT | Sundries | L.S. | 7.15 | 2.27 | 16.23 |
- TOTAL
- 1,389.16
- Add 1 % Water charges on “W”
- +13.89
- TOTAL
- 1,403.05
- Add GST on “X” (multiplying factor 0.2127)
- +298.43
- TOTAL
- 1,701.48
- Add 15% CPOH on “Y”
- +255.22
- TOTAL
- 1,956.70
- Add Cess @ 1% on “Z”
- +19.57
- Cost of 10.00 sqm
- 1,976.27
- Cost of 1.00 sqm
- 197.63
- SAY
- ₹197.65
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1004
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1004. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.