Skip to main content

CPWD Analysis of Rates · Finishing

Painting (two or more coats) on rain water, soil waste and vent pipes and fittings with black anticorrosive bitumastic paint of approved brand and manufacture, over and including a priming of ready mixed zinc chromate yellow primer on new work

150 mm diameter pipes

Item number
13.55.2
Analysis basis
Detail of cost for 30 metre
Priced inputs
13
Derived rate
113.80 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.55.2 Painting (two or more coats) on rain water, soil waste and vent pipes and fittings with black anticorrosive bitumastic paint of approved brand and manufacture, over and including a priming of ready mixed zinc chromate yellow primer on new work: 150 mm diameter pipes — is derived from 13 priced inputs for 30 metre and works out to ₹113.80 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • Area=22/7 x0.1572 m x30m =14.82sqm
CodeInputUnitQuantityRate (INR)Amount (INR)
4202Red oxide Zinc chromate primerMateriallitre0.8140.00112.00
0131PainterLabourday0.36816.00293.76
0115CoolieLabourday0.36736.00264.96
9999Brushes, sand paper etcMaterialL.S.15.992.2736.30
9977CarriageMaterialL.S.0.912.272.07
0828Anticorrosive bituminous paint (black)Materiallitre1.41120.00169.20
9977CarriageMaterialL.S.2.082.274.72
0131PainterLabourday0.8816.00652.80
0115CoolieLabourday0.8736.00588.80
9999Putty, sand paper etcMaterialL.S.8.062.2718.30
9999SundriesMaterialL.S.11.962.2727.15
9999Wire brushes for cleaningMaterialL.S.7.152.2716.23
9999Extra for delaysMaterialL.S.94.122.27213.65
TOTAL
2,399.94
Add 1 % Water charges on “W”
24.00
TOTAL
2,423.94
Add GST on “X” (multiplying factor 0.2127)
515.57
TOTAL
2,939.51
Add 15% CPOH on “Y”
440.93
TOTAL
3,380.44
Add Cess @ 1% on “Z”
33.80
Cost of 30.00 metre
3,414.24
Cost of 1.00 metre
113.81
Say
113.80

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 996. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works