Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared

Item number
2.31
Analysis basis
100 sqm
Priced inputs
2
Derived rate
₹17.60/ SQM
D-01/RATE ANALYSISITEM 2.31

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.31 (Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared) is derived from 2 priced inputs for 100 sqm and works out to ₹17.60 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 2.31DETAILS OF COST FOR 100 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday1.08736.00794.88
0115LABCoolieday0.6736.00441.60
BUILD-UP TO RATE
TOTAL
1,236.48
Add 1 % Water charges on “W”
+12.36
TOTAL
1,248.84
Add GST on “X” (multiplying factor 0.2127)
+265.63
TOTAL
1,514.47
Add 15% CPOH on “Y”
+227.17
TOTAL
1,741.64
Add Cess @ 1% on “Z”
+17.42
Cost of 100 sqm.
1,759.06
Cost of 1 sqm.
17.59
SAY
₹17.60
D-02/SOURCEPRINTED PAGE 132
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
132

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 132. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.