Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps

150 mm diameter
Item number
19.5.2
Analysis basis
10 metre
Priced inputs
2
Derived rate
₹98.45/ METRE
D-01/RATE ANALYSISITEM 19.5.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.5.2 (Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps : 150 mm diameter) is derived from 2 priced inputs for 10 metre and works out to ₹98.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 19.5.2DETAILS OF COST FOR 10 METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday0.49736.00360.64
0115LABCoolieday0.45736.00331.20
BUILD-UP TO RATE
TOTAL
691.84
Add 1 % Water charges on “W”
+6.92
TOTAL
698.76
Add GST on “X” (multiplying factor 0.2127)
+148.63
TOTAL
847.39
Add 15% CPOH on “Y”
+127.11
TOTAL
974.50
Add Cess @ 1% on “Z”
+9.75
Cost of 10 metre
984.25
Cost of 1 metre
98.43
SAY
₹98.45
D-02/SOURCEPRINTED PAGE 1705
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1705

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1705. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.