Providing and fixing aluminium tubular handle bar 32 mm outer dia, 3.0 mm thick & 2100 mm long with SS screws etc .complete as per direction of Engineer-in-Charge

Anodized (AC 15 ) aluminium tubular handle bar
Item number
21.12.1
Analysis basis
10 nos
Priced inputs
5
Derived rate
₹575.75/ NO
D-01/RATE ANALYSISITEM 21.12.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 21.12.1 (Providing and fixing aluminium tubular handle bar 32 mm outer dia, 3.0 mm thick & 2100 mm long with SS screws etc .complete as per direction of Engineer-in-Charge Anodized (AC 15 ) aluminium tubular handle bar) is derived from 5 priced inputs for 10 nos and works out to ₹575.75 per no after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • 10x22/7 x 1/4 (0.032x0.032 - 0.026 x 0.026) x
  • 2.10 = 0.0057 cum
  • 0.0057 cum @ 2710 kg/ cum = 15.56kg
  • Total = 16.34 kg
  • Add 5% wastage 0.78 kg
ANALYSIS OF RATES · ITEM 21.12.1DETAILS OF COST FOR 10 NOS HANDLE BAR
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7306MATAluminium T or L sectionskilogram16.34198.003,235.32
7389MATAnodising 15 microns on aluminium sectionskilogram16.3442.00686.28
9977MATCarriage of materialL.S.4.422.2710.03
8647MATStainless steel screws 30 mm x4 mm100 nos0.0842.003.36
0111LABCarpenter 1st classday0.125897.00112.13
BUILD-UP TO RATE
TOTAL
4,047.12
Add 1 % Water charges on “W”
+40.47
TOTAL
4,087.59
Add GST on “X” (multiplying factor 0.2127)
+869.43
TOTAL
4,957.02
Add 15% CPOH on “Y”
+743.55
TOTAL
5,700.57
Add Cess @ 1% on “Z”
+57.01
Cost of 10 nos
5,757.58
Cost of 1 no
575.76
SAY
₹575.75
D-02/SOURCEPRINTED PAGE 1833
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1833

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1833. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.